Project Site Location: Changwon-si, Gyeoongnam

The construction Name: Roadbed Construction Area 4 of Gyeongjeon line and Track Railway

Ordering Organization: Korea Rail network Authority

Constructor: Hyundai Engineering and Construction Co.,Ltd

Subcontractor: Juil Construction Co.,Ltd

Delivery Date: June 2009

FINE MIGHTY TUNNEL FORM which used in construction of box type form such as underground roadways, power cable and water canals can be composed basically with standard of FINE MIGHTY WALL FORM SYSTEM and ‘FMP-60’ PROP SYSTEM with adding Hinge type hunch panel and movable wheel system.