Beijing Sub-Center Integrated Transportation Hub Project Section 04

Project Overview :Located in the core planning zone (Area 0101) of Beijing’s sub-center, this mega-project represents a total investment of ¥31.8 billion and serves as Asia’s largest underground transportation hub. The underground complex spans 1.28 million square meters and integrates rail, metro, bus, and commercial functions, while the above-ground development covers 1.3 million square meters for mixed-use urban spaces.

Application

Transportation Hub

Client

Beijing urban&rural construction group co.,ltd

Location

Beijing Sub-center, China

Start Date

Jul 2023

Products Offered

Innovative Process

The Challenge

1. Single-Sided Formwork Construction of Basement Walls When constructing basement walls where double-sided formwork is impractical (limited space or adjacent structures), single-sided formwork systems could be an efficient solution.

2.Independent Column Formwork with High Reusability to Reduce construction costs.

3.High quality concrete forming and finishing.

Column Formwork

Products Offered

RS50 Soldier System For Single-side Formwork

Smart steel-framed formwork

Mighty adjustable column formwork

Result And Feedback

1.The RS50 Soldier System For Single-side Formwork was combined with Smart formwork together, to realize manual movement of single-sided formwork.

This design allow manual handling and horizontal transfer by workers without heavy machinery.

2.High Template Reusability

6 sets Column formworks for 207 Columns (Avg. 34.5 Cycles per Set).

3.Superior Concrete Casting Quality

The system ensures high-precision concrete surfaces with minimal defects, eliminating the need for costly repairs like patching or grinding.

4.It is environmentally friendly and does not generate any construction waste.